Zapier Ready Integration · Britixo Help Centre

Pause, disconnect or hand over a Zapier workflow

Pause Britixo automations, arrange connection revocation and transfer ownership without confusing Zap deletion with CRM data deletion.

Reviewed 5 November 2026Connector 1.1.2Approved setup required
Jump to steps

Before you begin

List the Zaps and company connections involved. Agree who owns any pending work and whether the change is a temporary pause, a permanent disconnect or a staff handover.

Where to go

CRM workspace → Tools → Zapier Ready Integration (or Utilities in a classic layout)

Follow these steps

  1. Pause the relevant Zaps in Zapier and review other workflows using the same company connection.
  2. In the CRM, open Zapier Ready Integration → Manage connections.
  3. For permanent removal, identify the correct connection and choose its Disconnect connection control. This revokes that connection and cancels its pending deliveries.
  4. For handover, connect an approved replacement staff account and test the new workflow before retiring the old connection.
  5. Retest remaining Zaps and inspect pending business work. Already running requests may finish, and existing CRM or destination records are preserved.

Check the result

The old automation stops as intended, remaining Zaps use the right connection and any replacement workflow has been tested.

Rules, fields and operating limits

  • CRM disconnection revokes future API use and disables the connection’s event subscriptions. Pending deliveries are cancelled.
  • A request already in progress may finish. Turn off the related Zaps in Zapier as well.
  • Pausing a Zap, removing a subscription and revoking an entire connection are separate actions.

If something does not look right

If events continue after a Zap is paused, check for another active Zap or subscription and ask support to verify connector-side authorisation. Do not assume that deleting one browser connection view stops every workflow.

Questions and answers

Does disconnecting delete existing leads?

No. Connection revocation does not delete CRM leads or records already created in another app.

Does pausing a Zap revoke its credentials?

Do not assume so. Pausing stops that Zap; permanent credential revocation is a separate connection-management operation.

Can one Zap be paused while others keep running?

Yes, subject to the way the Zaps share connections and subscriptions. Review the affected workflows before revoking a shared connection.

What happens to queued events after revocation?

The worker rechecks authorisation and can cancel deliveries that are no longer authorised. Agree how any unfinished business work will be handled.

Can I hand over my personal login?

Do not share a personal password or verification code. Arrange an approved staff/account handover and replacement connection.

Can I reconnect later?

You can repeat the approved consent flow if the workspace and account remain eligible. Reconnection does not promise recovery of historical missed events.

Contact Britixo support. Include the workspace, action, run reference and time; keep credentials private.