Sales CRM · Feature guide

Choose and order automation actions

Schedule an activity, set the next step, update a forecast category or start a cadence from a matching deal event.

Audience: authorised staffPermission: Administrator to configure; initiating staff member needs Edit dealsReviewed 30 October 2026

Video walkthrough · 0:36 · English captions

Britixo Automation: Sales Triggers and Ordered Task Workflows

Britixo Automation: Sales Triggers and Ordered Task Workflows. Follow the live application screens with clear instructions and English captions.

Watch this guide on YouTube ↗ · Use the player's CC control for captions.

Browse the tutorial playlist ↗

The recording explains automation controls. It does not claim that a production rule was executed. Demonstration workspace with fictional records. Availability depends on workspace configuration and permissions.

Read the walkthrough transcript

Open Sales setup in Sales CRM and add an automation. Give the rule a clear name, then choose the trigger and conditions.

Review the action, timing and priority. Check the conditions and active state before saving, then test the rule against a controlled opportunity and inspect its results.

Use task Workflows when delivery needs ordered project stages. Choose the project, dates, stage owners and checklists. Review the resulting tasks and handovers after creation.

Where to goSales CRM → Sales setup → Configure automation → Apply these actions

Before you start

Use your own authorised staff account in the intended Britixo workspace. The Sales CRM module must be available and your role must include the permissions stated above. Existing leads, customers, communications and customer portal pages retain their normal access rules.

Follow these steps

  1. Choose Schedule activity to add a call reminder, meeting, task or email reminder. Enter its title, instructions and a delay from zero to ninety days.
  2. Choose Set next step to write the follow-up instruction shown on the deal.
  3. Choose Set forecast category to select Pipeline, Commit, Best case or Omitted.
  4. Choose Start cadence and select an available template when the deal should enter a structured follow-up process.
  5. Use Add action for further actions, review the top-to-bottom order and save the rule.

Behavior and limits

  • Schedule activity calculates its due time from the triggering event and assigns the current deal owner. It does not execute the communication or task.
  • Set next step and Set forecast category update those deal fields. They do not change stage, probability, value or owner. If repeated, the last value for the same field takes effect.
  • Actions are configured as a simple ordered list. Conditions are evaluated once for the event; field changes do not cause another rule evaluation.
  • Start cadence requires an active template, an open non-archived deal, an eligible owner and no active or paused run. Otherwise that action is recorded as skipped.
  • A runtime validation failure in one action is recorded with a reason; other configured actions may still apply. A database failure rolls back the event’s changes rather than reporting a successful partial save.
  • Changing next-step or forecast information cancels an outstanding stage approval so that a reviewer is not asked to approve obsolete deal details.

Check it worked

  • Check each action result in Automation activity, not just the rule’s overall history entry.
  • Confirm a generated reminder’s owner and due time and check any changed next-step or forecast value.

Troubleshooting

  • A cadence action can be skipped because a run already exists or its template was retired. Review that condition before triggering a new event.
  • A staff member with Create permission but no Edit permission can create a permitted deal, but automation actions are recorded as skipped.
  • Rules never silently replace a paused cadence. Stop it explicitly before starting a different process.